Everyone in the choice of the purchase of dry mortar mixing production equipment, generally agreed that the larger the capacity of the hybrid host, the higher the power, the production efficiency can be improved, although this idea is feasible, but also flaws. After ten years of sales experience and customer return visit, in the production practice, summed up the dry mortar to improve production efficiency, not only the host capacity and power size, but also according to the production line in the equipment and equipment between the reasonable match , the production process of mechanical intelligence and the degree of automation, determine the level of production efficiency.
Today, most of the production equipment of the feed are used artificial throwing, which not only increased the degree of labor workers, but also increased production costs, production efficiency is also greatly reduced. In order to break this layout, the direct use of the raw material tank to raise, with a screw conveyor into the weighing warehouse, weighing, and then by the bucket elevator to the material into the vertical mix, waiting for the raw materials with a good , And then into the mixing host, stirring mixing. This not only improves production efficiency but also greatly reduces the production time and the labor intensity of the workers.
According to customer feedback, the current production of the host is 2m ³, the daily output is 80 tons, if the host changed to 4m ³, whether to make the daily output doubled? The result is certainly not work. Because in the configuration of the production line, the material into the material delivery device, with a mixed warehouse, finished goods warehouse, packaging machines are set for the 2m ³, if a single change the size of the hybrid host, regardless of the reasonable match before and after, like a head Is the bottleneck, belly and then also subject to the bottleneck. If you really want to achieve the increase in production, only to achieve a reasonable match.

评论
发表评论