Proper use of dry mortar mixing equipment points:
1, Dry powder mortar equipment should be set in a flat position, with a wooden mat before and after the axle, so that the tire put overhead, so as not to move around, the occurrence of moving.
2, Dry mortar equipment should be implemented, two leakage protection, power supply after work connected, you must carefully check the empty car trial that qualified, before use. When the test run, should check the mixing cylinder speed, is appropriate, under normal circumstances, the empty speed than the car (after loading) slightly faster 2 to 3 turn, such as the difference is more, should adjust the ratio of wheel and transmission wheel.

3,The direction of rotation of the mixing cylinder should be consistent with the direction of the arrow, if not true, should correct the motor wiring.
The following are the same as the "

4, Check the transmission clutch and brake is flexible and reliable, whether the damage to the rope, the track pulley is good, there are obstacles around the various parts of the lubrication and so on.
5, After the boot, often pay attention to the operation of the various parts of the mixer is normal. When shutting down, always check the mixer blade is bent, the screws have broken or loose.
6, When the concrete is finished mixing or is expected to stop more than 1h, in addition to the remaining material out of the net, the application of stones and water into the shaker, the boot turn, stick to the mortar on the barrel, washed all the discharge. No water in the barrel, so as to avoid barrel and leaf rust. At the same time should also clean the mixing tube outside the fouling, so that the machine to keep clean and intact.


7, after get off work and shutdown, when not in use, should be powered off, and lock the switch box to ensure safety.






评论

此博客中的热门博文

Electrical system of powder dry mortar production line

Dry powder mortar equipment test heavy load, commissioning to meet the conditions   First, the electrical (instrument) control and control systems and instrumentation adjustment test.   Second, lubrication, gas (steam) dynamic inspection and adjustment test.   Third, the mechanical and the system to adjust the joint test.   Fourth, the empty load test run, should be in the above one to three adjustment test after passing. Dry powder mortar production line  of the electrical system to meet the conditions can be debugged:   First, according to the electrical schematic diagram and the installation wiring diagram, the equipment internal wiring and external wiring should be correct.   Second, according to the type of power, grade and capacity, check or debug its cut capacity, fuse capacity, overvoltage, undervoltage, overcurrent protection, inspection or debugging content should meet its requirements.   Third, according t...

Trends of dry powder mortar industry

What is  dry powder mortar ? Dry mortar refers to the dry, sieved treatment of aggregate (such as quartz sand), inorganic cementing materials (such as cement) and additives (such as polymers) and other raw materials, according to a certain proportion of physical mixing, and the formation of a Granular or powdery, in the form of bags or bulk, transported to the site, add water can be used directly after mixing the material.   Dry mortar we also known as mortar dry powder, dry mixing, dry mix ing  powder, and some building adhesives also belong to this category. Dry mortar in the construction industry to play a thin layer of bonding, liner, protection and decoration role, construction and decoration works is widely used.      At present, the domestic construction of dry mortar production and application, has formed a new industry for the housing industry, to create new growth points. Dry powder mortar, the general use of fly ash and other industrial ...